CAREERS | RESERVED AREA | CONTACTS | ITALIANO
SINA, on behalf of the subsidiary Itinera, carried out the execution design of the construction comprising Lot 2 of the railway connection between Terminal 1 and Terminal 2 of the intercontinental airport of Milan Malpensa “Città di Milano” (double track railway connection of 3.4 km), within the municipality of Somma Lombardo (Va). In particular, the line and road works and the line and station electrical systems were designed as follows:
The contract also included the execution design of the track systems, with the construction of approximately 3,250 meters of double track and approximately 920 meters for the two priority tracks in the new Terminal 2 station.